Homepage Contact Training Manual Installations Introduction

Typical Specifications (page 5)

G. INSTALLATION

1. External flanges are supplied for influent, effluent, gravity overflow, weirs, and sludge return.

2. All interconnecting piping is shipped with the system.

3. Provision will be made for the services of competent, factory-trained personnel for a specified starup period. The time specified is adequate to check operation of the plant when sufficiently fed with influent to enable full-cycle operation.

Application Data Sheet | Waste Characteristics | Estimates of Daily Flow

Warranty Information

Homepage | Installations | Training | Contact